Cooling pad production capacity calculator

Convert a monthly saleable-pad target into a preliminary gross output requirement. Adjust the schedule, expected uptime, first-pass yield and buffer to test realistic scenarios.

Preliminary capacity result

Scheduled hours/month
200
Productive hours/month
150
Good pads/productive hour
80
Planning rate incl. yield + buffer
96.8 pads/hour

The unbuffered gross rate is 84.2 pads per productive hour. This calculator estimates a planning rate, not guaranteed machine output.

How the result is calculated

The tool calculates scheduled hours, reduces them by expected uptime, adjusts the required rate for first-pass yield and then adds your selected capacity buffer. It uses finished pads as the planning unit.

What it cannot determine

Actual output depends on pad size, flute type, paper, resin, adhesive, drying, curing, changeovers, utilities, operator skill and quality limits. Confirm each process stage with a written technical proposal.

Turn the estimate into a line specification

Send the result with your pad sizes, 5090/7090 mix, paper grade, facility power, destination and floor space. Our team can review which process stages must sustain the rate.

Next steps

Once you know the output you need, compare it against the machine specifications and what a line of that size costs.